I have over 35 years of experience in Drilling Fluids and Waste Management having worked for Baker Hughes and MI Swaco and I have worked as a Fluids & Waste Management Supervisor for Operators since 2010.
As a field engineer, I have killed wells, stopped loss circulation, rectified contamination problems, solved most of the operational challenges faced at rig site and mentored and trained many junior engineers. While in the office I have managed up to 4 rigs, 3 service companies and personnel, controlled inventory and overseen well cost reductions of +/-30% with the implementation of cost saving methods such as optimized Fluids recycling, Solids Control performance evaluation and adherence to preventative over treatment control measures.
I have managed projects in South East Asia, the Middle East and West Africa and have drilled over 50 deep water wells in water depths ranging from 800-2800m.
I have extensive High Temperature, Horizontal / Extended reach experience and am experienced in all types of Water / Oil / Synthetic based & Formate Drilling Fluids & Products including High Performance Bentonite Free systems, High Weight systems, Waste management processes and equipment including Solids Control, Water Treatment, Cuttings processing & Re-injection in addition to Liquid Bulk plant construction, supervision and maintenance.
I have worked land ops for +16 years and offshore for 18+ years and I have attached my detailed CV with references for your consideration.
I am available immediately and look forward to hearing from you.
Should you have any questions please contact me.
My specialties include:
• Deep Water Drilling (2800m+) - India, China, Angola, Eq. Guinea, Gabon, Congo, Nigeria.
• HT (190C) - Vietnam, Australia, China, Indonesia, Oman
• Extended Reach Drilling (4,000m+) - Vietnam, India, Iran.
• Horizontal (+8000m) - Qatar, India, Nigeria, Australia, Indonesia, Trinidad.
• Multi-lateral (3 legs) India, Qatar. • H2S Qatar, Iran, Kurdistan, Pakistan
• Synthetic / Oil Based Systems • Water Based Mud Systems / Formate Systems • High Weight Systems +16ppg
• Waste Management • Design of Drilling / Completion Fluids
Nothing Found
It seems we can’t find what you’re looking for. Perhaps searching can help.